Split-level Ranch: Framing and Demolition
S2E3 · 1991-09-16
Construction begins on the front entryway; the old bathroom fixtures are removed.
The show’s own verdict is on its page.
S2E3 · 1991-09-16
Construction begins on the front entryway; the old bathroom fixtures are removed.
The show’s own verdict is on its page.