HometimeHometimeSeason 242010 · 26 episodesEpisodes1Sculpture Studio Extension - FloorThe Hometime crew uses pavers and retaining walls to capture space under a second-story deck.2Sculpture Studio Extension - WallsThe Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.3Sculpture Studio Extension - Wrap UpThe Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.4Stone Cottage – Cul-De-Sac PrepThe Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.5Stone Cottage – Concrete & FoamThe Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.6Stone Cottage – Instant HouseThe Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.7Stone Cottage – RoofscapeThe Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.8Stone Cottage – WindowsThe Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.9Stone Cottage – Concrete FloorsThe Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.10Stone Cottage – Inner WorkingsThe Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.11Stone Cottage – InsulationThe Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.12Stone Cottage – GeothermalThe Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.13His and Her GarageThe Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."14Stone Cottage -- Interior WallsAfter some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.15Stone Cottage -- Vaulted CeilingsThe project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.16Stone Cottage -- MillworkWooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.17Stone Cottage -- Exterior DoorsThe Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.18Stone Cottage -- TileThe Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.19Stone Cottage -- DrivewayThe Hometime crew installs the paver driveway, as well as the master bathroom cabinets.20Stone Cottage -- Interior DoorsThe Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.21Stone Cottage -- Laundry RoomThe Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.22Stone Cottage -- OfficeThe home office begins to take shape, as the custom staircase work begins.23Stone Cottage -- CountertopsThe stone countertops are fabricated and installed.24Stone Cottage -- Fixtures and AppliancesThe Hometime crew installs cabinets, countertops and landscaping.25Stone Cottage -- Retractable ScreensThe covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.26Stone Cottage -- Sod and StoneThe custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.Season 23Season 25Season 26Season 27