Episode 12

S1E12 · 2004-07-09 · 50 min

Progress on the kitchen and wall removal, fitting the new heating system, and loft insulation. With tips on joining pipework, fitting a garden tap, matching bricks, the first phase of rendering outside brickwork, and re-hanging a door.

The show’s own verdict is on its page.