Arlington 2014: Part 6: Additional Details

S35E14 · 2014-02-08

The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

The show’s own verdict is on its page.