Dorchester Triple Decker | Finish Work Begins

S42E23 · 2021-05-13

On the first floor, Tom Silva and Kevin O'Connor reinstall the upper cabinets that survived the fire. Tom teaches the apprentices to trim a window in the kitchen. HVAC contractor James Bouchard shows Richard Trethewey the plan for hot water and heating. Kevin joins Carol and her sister Willie to shop for appliances for all three levels. Mark Ferrante is tiling the first of three bathrooms.

The show’s own verdict is on its page.