West Roxbury: Outdoor Oasis

S43E20 · 2022-02-24

At the house, out front we get to know the contractor while Ipe is being installed on the porch ceiling. Out back, a brick patio is laid. Inside, a dual fuel HVAC system is installed and ducts ran. At the Dracut Centre School, corbels are restored.

The show’s own verdict is on its page.