Lexington: The Big Dig
S45E3 · 2023-10-12 · 27 min
Accessible features integrated into the design begin at construction. A new mechanical room connects to the old via a block wall tunnel, HVAC ducting is buried underground, and after learning about residential elevators, framing begins for one.
The show’s own verdict is on its page.